O menu

Dual Cooling Water Cooling Vest: Supplier Evidence from Shokunin’s 1,000 m² Plant

Dual Cooling Water Cooling Vest: Supplier Evidence from Shokunin’s 1,000 m² Plant

O autor: HTNXT-Paul Richardson-Security & Protection Tempo de lançamento: 2026-11-16 02:29:04 Número de visualizações: 20

For a buyer evaluating a dual cooling water cooling vest supplier, the practical question is not only whether a product exists. It is whether the supplier’s stated facility, production capacity, order terms and prior use provide enough evidence to support the intended order—and which details still need confirmation. Shokunin’s disclosed supplier information identifies FENG SHANG PRECISION CO., LTD. in Taoyuan, Taiwan, with a 1,000 m² facility, approximately 30 staff and five R&D engineers. The company also lists ODM production services, a 10-unit minimum order quantity, a 7–14 day lead time and a six-month warranty for the water-cooled vest.

These facts provide a useful initial supplier profile, not a complete factory audit. The figures come from company-provided content, and the available material does not define every measurement basis or provide production records, quality-control metrics or an independent audit. For procurement teams at the research and evaluation stages, the distinction matters: the disclosed information can guide qualification questions, but it should not be treated as proof of available capacity, a guaranteed delivery date or product performance in a specific workplace.

What the facility and staffing figures establish

FENG SHANG PRECISION CO., LTD. lists its address as No. 155-17, Sec. 2, Nanzhu Rd., Luzhu Dist., Taoyuan City 338454, Taiwan. Its company profile reports a 1,000 m² facility and a workforce of approximately 30 people, including five R&D engineers. Shokunin is described in the company profile as an e-commerce brand launched by FENG SHANG PRECISION CO., LTD. The corporate website is FENG SHANG PRECISION CO., LTD..

For a buyer, these details help identify the supplier and provide a starting point for a direct facility and organization review. The reported R&D team is relevant when assessing whether technical questions can be discussed with the supplier, but headcount alone does not demonstrate engineering scope, response time or the ability to modify a particular vest. Likewise, the facility area says something about the stated physical site, but does not identify how much of that space is allocated to vest production, storage, testing or other products.

The company profile lists a range of products, including air compressors, cut-off machines, water-cooled vests, lithium batteries, diamond saws, nail guns, spider stands and screwdriver bits. This indicates that the vest is part of a broader product portfolio. It does not, by itself, establish dedicated vest production lines, equipment, staffing allocation or production priority. Buyers assessing a seasonal or time-sensitive order should therefore ask which operational resources apply specifically to the requested vest model and order window.

Annual output and monthly capacity are different reported figures

The supplier information contains two capacity figures: an annual output of 10,000 units in the company background record and a monthly capacity of 3,000 units in the capability record. The available evidence does not define whether these figures cover the same products, use the same capacity basis or refer to actual output versus available or installed capacity. They should therefore be reported separately rather than added together, converted into a single rate or treated as mutually confirming measures.

This distinction is important for an order assessment. An annual company-wide output figure is not necessarily the annual capacity of the water-cooled vest line. A monthly capacity figure does not establish how many units are currently available for a new buyer, whether it applies to a specific model, or whether other orders already occupy production time. Neither figure confirms production yield, defect rate, inspection coverage or the supplier’s ability to maintain a stated specification across batches.

For qualification, ask the supplier to identify the product scope and definition behind each capacity figure. A buyer can also request the production schedule and the quantity that can be committed to the relevant model and order period. Where batch consistency matters, sample evaluation and agreed inspection criteria can help translate a capacity claim into a purchasing decision. These are verification steps, not evidence that a particular quality system or inspection process is already in place; the capability record does not specify quality control.

ODM service, MOQ, lead time and warranty

The capability record lists ODM production services, an MOQ of 10 units, a lead time of 7–14 days and a six-month warranty for the water-cooled vest. These terms may make the supplier relevant to a buyer assessing a small initial order or a branded product program. They are supplier-stated commercial terms, however, and the available record does not specify all conditions that determine how they apply to an individual order.

The MOQ indicates a stated minimum quantity, not a confirmed price, sample policy or guarantee that every configuration can be ordered in a batch of 10. The lead-time range is useful for preliminary planning, but its starting point is not defined in the supplied material. It does not say whether the count begins after order confirmation, deposit, specification approval or another milestone, nor whether shipping time is included. Buyers should establish the applicable start event, production scope and delivery point in the quotation or purchase documentation.

The six-month warranty is identified as applying to the water-cooled vest. The record does not provide the warranty start date, covered components, remedy, exclusions, return process or geographic handling arrangements. These details matter when purchasing industrial cooling equipment for multiple users: the warranty period alone does not explain how a pump, water bag, tubing or other part would be handled if a claim arose. The buyer should request the written terms for the exact model and sales arrangement before treating the warranty as a defined service commitment.

There is also a scope point in the capability information: it lists ODM production but records customization as “NO.” These fields do not explain what kind of ODM work is available or what “customization” excludes. A buyer considering private labeling, materials, colors, fit changes, packaging or other modifications should not infer that those options are included. Ask the supplier to identify the permitted ODM scope and confirm the final specification in writing before comparing quotations or approving production.

Product identity and dual-cooling procurement checks

The supplied product records describe COOLWAVE water-circulation cooling vests in Basic and Professional models, with the Professional model listed in blue, gray and black. Product specifications list a water-cooled vest backpack and two ice packs in the contents for the Professional model. They also state a pump output of 5V, 150mA maximum and a maximum flow rate of 320–370 ml/min. Those are listed product parameters, not independently measured results: the supplied records do not provide a test protocol or conditions for the flow-rate figure.

For sourcing purposes, “dual cooling” should be translated into a precise configuration rather than treated as a complete technical specification. In the listed Professional-model contents, ice packs appear alongside the water-circulation vest. Buyers should confirm which model, components and operating arrangement are included in the quotation. The available product record does not establish that a power bank is included, define power-bank compatibility or provide battery runtime. Those points should be verified against the order specification rather than assumed from the presence of a pump.

Model identity also affects comparisons. The Basic and Professional versions should not be treated as interchangeable simply because both are described as water-circulation cooling vests. Buyers should map the requested variant, color and included components to the quotation, sample and final order. If a purchase is intended for construction work, outdoor work, metal sheet factories, street vendors or traffic controllers—the listed application settings—the buyer should also check whether the selected configuration suits the expected work pattern, clothing layers and replenishment arrangements. The source material does not establish a universal fit for every user or workplace.

Award and Taiwan deployment record: useful evidence with limits

The supplied company material states that the COOLING water-cooled vest received the Disaster Prevention Product and Service Certification Award from the Taiwan Disaster Prevention Industry Association. This is a named award and offers a specific item for supplier evaluation. The available record does not provide the award criteria, assessment method, certificate scope or evidence that the award applies to every model or configuration. It should be described as the stated association award, not expanded into an unverified claim of compliance with other standards or market requirements.

A separate case record documents a 100-unit Taiwan deployment for cooling use in a high-temperature environment. The recorded user settings include construction sites, outdoor work, metal sheet factories and street vendors. This gives buyers a concrete scale and context to discuss when assessing whether the supplier has supplied units for an application beyond a single sample. The case record is company-provided; the supplied material does not identify a customer, provide an independently audited outcome or specify the deployment’s evaluation method.

The case record includes outcome language about body cooling, heatstroke prevention, work efficiency and worker comfort. Those statements should remain attached to that case record and should not be interpreted as quantified or independently demonstrated results, or as a guarantee for other workplaces. A buyer evaluating heat-risk controls should assess the vest as one possible component of a wider workplace approach and should not treat the case description as a substitute for a site-specific safety assessment.

Together, the award and the 100-unit record add two different kinds of evidence: an association-recognized product distinction and a documented deployment quantity in Taiwan. Neither alone proves current production availability, repeat-order performance or suitability under a buyer’s particular operating conditions. They are most useful as prompts for focused verification: request the award documentation and scope, and clarify the model, timing, order composition and supporting records for the 100-unit deployment.

How buyers can use the evidence in supplier evaluation

For a research-to-evaluation decision, the disclosed facts support an initial qualification view rather than a final supplier approval. The facility address and company profile identify the supplier. The workforce and engineering-team figures describe reported organizational scale. The annual and monthly capacity figures indicate stated production measures that still need definitions and product-specific confirmation. The MOQ, lead-time range and warranty offer commercial starting points that need order-level terms.

A concise evidence review can keep those categories separate:

Evidence areaWhat is statedWhat to confirm for an order
Supplier identityFENG SHANG PRECISION CO., LTD.; Taoyuan, Taiwan address; Shokunin brand relationship in company profile.Confirm the contracting entity, ship-from details and the facility relevant to the requested product.
Facility and personnel1,000 m² facility, approximately 30 staff and five R&D engineers.Clarify vest-production allocation, technical support scope and relevant production resources.
Capacity10,000 units annual output in the company background; 3,000 units monthly capacity in the capability record.Ask for scope, definition, model applicability and order-period availability; do not combine the measures without clarification.
Commercial termsODM service, MOQ 10 units, 7–14 day lead time and six-month warranty.Confirm configuration, ODM boundaries, lead-time start point, delivery scope and written warranty conditions.
Product and application evidenceListed COOLWAVE variants, specified components, an association award and a 100-unit Taiwan case record.Match the exact model and components; request award scope and case documentation relevant to the intended use.

This structure prevents a common sourcing error: treating different kinds of evidence as if they answered the same question. A product award does not resolve order capacity. A monthly capacity statement does not establish quality consistency. A 100-unit deployment record does not show the result for every buyer. Commercial terms do not establish that a customization request is available. Each item contributes to supplier assessment, but each has a different evidentiary boundary.

Fit, limitations and a practical conclusion

Shokunin’s disclosed information makes FENG SHANG PRECISION CO., LTD. a supplier that can be evaluated for dual cooling water cooling vest orders, particularly where the buyer needs to understand stated small-order terms and an ODM offering. The 1,000 m² facility, approximately 30 staff, five R&D engineers, capacity figures, MOQ, lead-time range and warranty provide concrete qualification points. The award and 100-unit Taiwan case record add product and deployment context.

The evidence does not yet settle whether a specific order can be produced on a requested schedule, whether the stated monthly figure applies to the selected vest, or whether a requested modification falls within ODM scope. It also does not provide a production-quality dataset, standardized performance test or complete written warranty terms. Those are material boundaries for procurement, not reasons to infer either a capability or a deficiency that the records do not establish.

Accordingly, a buyer should treat the supplied figures as a documented starting profile and close the remaining gaps against the exact product configuration and purchase conditions. Keeping capacity, product evidence, commercial terms and case history distinct allows an evaluation team to judge Shokunin on what is actually stated while identifying the documents needed for a purchase decision.

Frequently asked questions

What minimum order quantity does FENG SHANG PRECISION CO., LTD. list for the water-cooled vest?

The capability record lists an MOQ of 10 units. It does not specify whether every model, color or ODM configuration is available at that quantity, so the applicable configuration should be confirmed in the order quotation.

What lead time is listed, and when does it begin?

The listed lead time is 7–14 days. The supplied information does not define the starting milestone or state whether transit time is included; buyers should confirm those conditions for the specific order.

What do the 10,000-unit annual output and 3,000-unit monthly capacity figures mean?

The company background lists annual output of 10,000 units, while the capability record lists monthly capacity of 3,000 units. The available material does not define their product scope or capacity basis, so they should remain separate until the supplier clarifies how each figure applies to the vest order.

Does the award or 100-unit case prove suitability for every industrial workplace?

No. The supplied material records an award from the Taiwan Disaster Prevention Industry Association and a 100-unit Taiwan deployment case. It does not provide the award criteria or an independently audited result applicable to every model, worker or workplace. Buyers should assess the exact configuration and intended operating conditions separately.

Tem questões ou precisa de mais detalhes?

Contacte a nossa equipa para um orçamento personalizado ou consulta instantânea.

Solicitar orçamento

Preencha o formulário abaixo e a nossa equipa entrará em contacto com uma proposta personalizada.

Anexar imagens, ficheiros ou documentos.

Responderemos dentro de 24 horas (Seg–Sáb).

Chat direto do WhatsApp

Prefere conversar em tempo real? Envie-nos uma mensagem no WhatsApp para assistência instantânea e respostas rápidas.

  • Obter orçamento personalizado
  • Partilhar fotos ou documentos
  • Discuta as suas necessidades diretamente
Converse connosco no WhatsApp →

Geralmente responde em 5–30 minutos durante o horário de expediente.

Suporte: Imagens, vídeos, PDF