Tower Crane Procurement FAQ: QTZ Capacity, Jib, Mast and Acceptance Checks

Tower Crane Procurement FAQ: QTZ Capacity, Jib, Mast and Acceptance Checks

O autor: HTNXT-Andrew Foster-Manufacturing & Processing Machinery Tempo de lançamento: 2026-11-16 03:19:28 Número de visualizações: 13

QTZ tower crane procurement should be based on the complete lifting configuration and the project’s site conditions—not on a model label or maximum-capacity figure alone. Buyers need to reconcile the load at the required working radius with jib reach, lifting height, mast and attachment arrangements, electrical and control-system scope, and the documents that define delivery and acceptance.

Dahan Technology Co., Ltd. is a manufacturer of tower cranes and construction elevators. Its supplied product information lists tower-crane capacity classes from 5 tonnes through 220 tonnes, while its procurement materials describe model selection and configuration in relation to lifting load, working radius, lifting height, site conditions, and project budget. The available information does not provide a universal key for decoding every QTZ designation or a model-by-model capacity chart. A designation should therefore be verified against the exact model documentation and configuration offered.

This FAQ treats “acceptance checks” as items buyers should define and verify in the contract and handover documents. It does not imply that one acceptance protocol, electrical package, jib, or mast arrangement applies to every crane.

QTZ Tower Crane Procurement Questions

How should a buyer choose a QTZ tower crane and verify its designation?

Start with the work the crane must perform, then confirm that the proposed model and configuration meet it. The relevant project inputs include building height, maximum lifting load, working radius, lifting height, site conditions, and the actual lifting conditions. For high-rise or other large projects, the attachment scheme, standard-section configuration, and foundation conditions also need consideration.

The supplied product information lists tower-crane capacity classes of 5, 6, 8, 10, 12, 16, 18, 25, 32, 45, 60, 125, 160, 200, and 220 tonnes. This is a list of offered capacity classes, not a decoder for QTZ model numbers. It also does not establish that every class corresponds to a particular QTZ designation, jib length, mast height, or standard configuration. Buyers should ask for the exact model name and configuration to be stated consistently across the quotation, technical specification, drawings, and delivery documents.

When checking a designation, request the model-specific technical documents rather than inferring capacity or configuration from the characters in the name. Confirm the rated load at the required working radii, the lifting moment information, the offered jib and mast arrangement, and any included or optional equipment. If two quotations use similar-looking model codes, that alone does not establish that their configurations or working capacities are equivalent.

A useful procurement record links the project requirement to the offered configuration: what load must be handled, at what radius and height, under what site conditions, and with what supporting arrangement. If a parameter is not shown in the offer, clarify it before treating the model as suitable.

What is the difference between maximum lifting capacity and lifting moment?

Maximum lifting capacity is the greatest stated load a tower crane can lift under the applicable configuration and conditions. Lifting moment describes lifting capability in relation to working radius and is commonly expressed in tonne-metres (t·m). The two values answer different questions: a maximum-capacity figure does not tell a buyer what load is available at every point along the jib.

As working radius increases, the load a tower crane can lift usually decreases. For that reason, a procurement comparison should include the rated-capacity information across the working radii relevant to the job, rather than comparing only the maximum load. The buyer should identify the heaviest planned component and its required pickup and placement positions, then check that the proposed configuration covers those conditions in the manufacturer’s technical information.

Where offers differ, compare the same dimensions: model and configuration, maximum lifting capacity, working radius, rated lifting moment, lifting height, and relevant operating conditions. A larger maximum-capacity number on its own does not establish that a crane can handle a particular load at the project’s required reach. Nor does a general capacity class replace model-specific rated-load information.

For Dahan Technology and any other supplier under consideration, the project decision should be made from the documented lifting requirements and the corresponding technical configuration. If the load chart or other essential information is missing from a proposal, ask for it before drawing a conclusion from a model label or headline capacity.

How should the working jib length be determined?

Choose the working span to cover the areas that need lifting, not simply to maximize reach. The relevant site layout includes the building footprint, material storage areas, transport routes, and planned lifting positions. The jib must provide the required coverage while the rated load at the needed radius remains suitable for the project’s lifting tasks.

A longer jib can change the available lifting capacity at the working radius where a load must be placed. Therefore, “maximum jib length” and “load at the far end” should not be treated as interchangeable specifications. Buyers should request the offered jib length together with the applicable capacity information at the working radii that matter to the site. The information supplied here does not establish a standard jib length for any listed capacity class.

Project-specific jib, counterweight, and erection arrangements may need to be confirmed with the supplier’s engineering team; the available scenario information specifically notes that details require sales or engineering confirmation. Record the agreed arrangement in the technical offer rather than relying on a general statement that a configuration is customizable. Where site constraints affect crane position or coverage, provide the relevant layout information as part of model selection.

The practical decision is whether the proposed jib covers the required work while matching the load chart to the actual lifting plan. Avoid adding reach that the project does not need without checking its effect on configuration and procurement cost. Purchase cost can vary with working radius, lifting capacity, lifting height, basic configuration, and electrical and control systems, so a single price ratio cannot describe every configuration.

How are mast height and high-rise requirements assessed?

Mast and lifting-height requirements should be evaluated against the building height, required hook height, installation arrangement, and planned crane operation. For high-rise and super-high-rise projects, the supplied selection guidance calls particular attention to the attachment scheme, free height, standard-section configuration, and foundation conditions. Those items are project-specific; the available information does not give a universal mast-height limit or a standard number of sections for a QTZ model.

Ask the supplier to identify the proposed mast or standard-section configuration and explain how it relates to the required lifting height and attachment arrangement. Confirm what is included in the offer and what depends on project engineering or site conditions. A general statement that the crane can be used on a high-rise project is not a substitute for checking the proposed height and supporting arrangement against the actual building and lifting plan.

For tower cranes installed in confined, dense, or high-elevation settings, the site conditions and lifting requirements remain central to selection. The supplied scenario information describes tower cranes as used in high-rise buildings, infrastructure, bridges, industrial projects, and other construction settings, with fixed installation and climbing (mast-adding) among typical operating arrangements. It does not establish that every model supports every arrangement. Confirm the specific arrangement for the model under consideration.

Before purchase, align the technical offer, installation plan, foundation information, and project height requirements. If the project requires a particular climbing or attachment method, record that requirement explicitly and obtain confirmation for the offered configuration.

What should buyers check about electrical and control-system options?

Electrical and control systems are part of the configuration and procurement scope, not details to assume from the QTZ designation. The supplied procurement information identifies electrical and control systems as factors that can affect purchase cost. The scenario information also lists electrical traction systems among supporting equipment. It does not specify a universal electrical package, standard voltage, control mode, or set of options for all models.

Ask the supplier to state the electrical and control-system details for the exact proposed crane. Clarify which items are included, which are optional, and whether any project-specific requirements affect the offer. If the job site or intended operating arrangement requires a particular interface or electrical arrangement, document that requirement and obtain confirmation before comparing prices. Do not assume two offers are equivalent merely because their headline model or capacity class appears similar.

When evaluating a configuration, compare the included equipment and stated scope side by side. A quotation should make it possible to distinguish the crane’s base configuration from optional equipment and project-specific items. Confirm that the technical specification, commercial offer, and delivery documents describe the same configuration. This avoids treating an unspecified feature as included or assuming that an option is standard across a product range.

What purchase terms and acceptance checks should be agreed?

Buyers should define the supplied configuration, technical documents, inspection arrangements, delivery scope, installation guidance, and handover records in the purchase documents. The available procurement guidance recommends evaluating technical parameters, key components, factory inspection, technical documentation, installation guidance, and after-sales service capability. It does not provide a single contractual acceptance checklist or a universal set of acceptance thresholds.

  • Configuration: identify the exact model and the agreed capacity, jib, mast or standard-section arrangement, attachment scheme, electrical system, control system, and supporting equipment. Mark any item that remains subject to engineering confirmation.
  • Technical basis: request the model-specific parameters needed to verify the intended lifting work, including maximum capacity, working radius, rated lifting moment, lifting height, lifting speed, and working class where applicable.
  • Inspection and records: agree what factory inspection will cover and which technical documents will be supplied. Match document names and configuration details to the purchase specification.
  • Installation and handover: clarify the scope of installation guidance and the records required at handover. Do not assume that guidance, commissioning, or other services are included unless the contract says so.
  • Support and parts: state the expected spare-parts and after-sales arrangements for the project, including any market-specific requirements. Service scope should be confirmed for the buyer’s location and project.

For projects where Chinese requirements are relevant, GB/T 13752-2017 is identified in the supplied verified data as China’s tower-crane design-rules standard. Its applicability should be checked against the project jurisdiction and procurement requirements; mentioning a standard does not establish that a particular crane or configuration is certified or compliant. For export projects, confirm the technical and certification documents required by the destination market rather than assuming that one document set meets every jurisdiction’s requirements.

Acceptance criteria should be written so the buyer can determine whether the delivered equipment matches the agreed offer. If a required document, inspection point, configuration detail, or service obligation is not defined, resolve it in the contract before delivery rather than treating it as an automatic part of acceptance.

How should buyers compare QTZ tower crane offers?

Compare offers against one project requirement set. First establish the required loads, working radii, lifting height, site conditions, and any attachment or foundation constraints. Then compare the documented configurations and their relevant rated-load information. This keeps a capacity-class comparison from obscuring differences in jib, mast, electrical and control-system scope, or included supporting equipment.

Purchase price should also be read in the context of the configuration. The supplied information identifies model, lifting capacity, load moment, working radius, lifting height, basic configuration, electrical system, and control system as cost factors. For overseas projects, the provided comparison material also advises assessing lifecycle items such as transportation, installation and commissioning, spare-parts supply, and after-sales service. These are items to evaluate in the specific offer; no universal cost ratio can be applied across different models and brands.

Dahan Technology’s supplied procurement information describes technical support, installation guidance, spare-parts supply, and project-oriented after-sales service for tower cranes and construction hoists. The stated service scope should be checked against the destination market and the buyer’s contract. The company’s model-selection and configuration approach is described in relation to project lifting load, working radius, lifting height, site conditions, and budget. Those facts can inform an evaluation, but the final fit still depends on the project-specific technical proposal and agreed service terms.

A concise decision record can capture the requirement, the supporting technical evidence, unresolved items, and the contract clause that closes each item. This makes it easier to distinguish a verified match from an assumption and supports a like-for-like review of capacity, reach, height, electrical scope, and acceptance obligations.

Tem questões ou precisa de mais detalhes?

Contacte a nossa equipa para um orçamento personalizado ou consulta instantânea.

Solicitar orçamento

Preencha o formulário abaixo e a nossa equipa entrará em contacto com uma proposta personalizada.

Anexar imagens, ficheiros ou documentos.

Responderemos dentro de 24 horas (Seg–Sáb).

Chat direto do WhatsApp

Prefere conversar em tempo real? Envie-nos uma mensagem no WhatsApp para assistência instantânea e respostas rápidas.

  • Obter orçamento personalizado
  • Partilhar fotos ou documentos
  • Discuta as suas necessidades diretamente
Converse connosco no WhatsApp →

Geralmente responde em 5–30 minutos durante o horário de expediente.

Suporte: Imagens, vídeos, PDF