The EverCore 261.2kWh/125kW commercial and industrial energy storage system features AC-DC separation architecture, air-cooled thermal management, and high-cycle LFP cells. Designed for reliable peak shaving, backup power, and self-consumption in demanding environments. EMC certified per EN/IEC 61000-6-2/4.
| Parameter | Value |
|---|---|
| Rated Energy Capacity | 261.2 kWh |
| Inverter Power Rating | 125 kW |
| Cell Type | EVE LFP 3.2V / 314Ah |
| Cell Cycle Life | 8000 cycles (≥70% capacity retention) |
| Protection Rating | IP55 (Cabinet) + IP66 (Inverter) |
| Anti-Corrosion | C4 grade (standard) |
| Operating Temperature | -25°C to 55°C |
| Max Altitude | 4000m |
| Certification | IEC 62619, CE EMC (EN IEC 61000-6-2/4) |
All models share the same architecture and cell technology.
Aluminum alloy casing with core electronic components. AC and DC sections are physically separated for optimal thermal and protection management.
Suitable for renewable power plants, commercial & industrial users, and utilities.
Customizable options include capacity expansion via additional battery cabinets, integration with existing PV systems (DC or AC coupling), and software integration with third-party VPP/EMS platforms. Contact us for specific requirements.
A C&I industrial end user in Denmark deployed a 125kW/261kWh EverCore system for self-usage of warehouse. The system saves on electricity bills and switches between on-grid and off-grid in under 10 milliseconds. (Source: Case study)
A self-consumption & backup project owner in Thailand uses 125kW/522kWh (dual cabinet) for stable operation and electricity bill savings. (Source: Case study)
Standard warranty is provided; specific terms depend on customer tier and region. Please consult with our sales team.
Our air-cooled design achieves temperature uniformity close to liquid cooling while eliminating coolant replacement and reducing O&M costs by approximately €9,500 per unit over the lifecycle.
Yes, the system operates from -25°C to 55°C and at altitudes up to 4000m, with C4 anti-corrosion coating for coastal or industrial environments.
It holds IEC 62619 safety certification (TUV) and CE EMC compliance (EN IEC 61000-6-2/4).
Installation time varies by site; typical commissioning is completed within a few days after delivery. Factory acceptance testing is included.
Yes, via the Solis AI Cloud Platform, providing real-time monitoring, multi-source price forecasting, and dynamic charge-discharge optimization.
MOQ is 1 unit.
Yes, the inverter supports up to 6 battery cabinets in parallel, allowing capacity expansion without additional inverter investment.