High-volume coating line for wheel hubs and wheel components, running 336 days a year with a 45-second lot cycle and a climate-controlled paint chamber.
This automated line is dedicated to wheel hubs and related wheel components, where volume and repeatability decide the cost per part. The line moves 1760 fixture trays per day on a 45-second lot cycle, operates 336 days per year at 22 hours per day, and is planned for 85% equipment utilization. Painting runs in a combined autonomous and robotic mode inside a chamber held at 25±2°C and 65±10% RH. Fixture trays up to 1350 × 900 × 200 mm are accepted, and the hall requirement is 100 m × 38 m × 5.4 m.
A lot is released every 45 seconds, giving a daily planning figure of 1760 trays for hub production programs.
Robotic painting is combined with autonomous mode, so hub faces and recessed areas are covered without relying on operator pace.
The line is engineered around 336 working days and 22 hours per day, which allows annual capacity to be modelled in advance.
Temperature at 25±2°C and humidity at 65±10% RH keep the coating result consistent through long production runs.
Trays up to 1350 × 900 × 200 mm are accepted, so multi-cavity hub fixtures can be used per lot.
The booth and piping are stainless steel on a carbon steel main frame, simplifying cleaning between colour changes.
| Parameter | Value |
|---|---|
| Part focus | Wheel hubs and wheel components |
| Working days | 336 days per year |
| Daily operation | 22 hours per day |
| Production cycle | 45 seconds per lot |
| Daily throughput | 1760 fixture trays |
| Equipment utilization | 85% |
| Painting method | Autonomous mode + robotic painting |
| Paint chamber temperature | 25±2°C |
| Paint chamber humidity | 65±10% relative humidity |
| Maximum fixture tray | 1350 × 900 × 200 mm (L × W × H) |
| Hall footprint | 100 m × 38 m × 5.4 m (L × W × H) |
| Utility media | Electricity, natural gas, steam, chilled water |
| Main frame | Carbon steel |
| Paint booth and piping | Stainless steel |
A carbon steel main frame carries the line, with stainless steel used for the paint booth and piping to support cleaning and resistance to paint contact. Reference modules in the photo set for this line family include pretreatment equipment, a gantry pretreatment system, a flame treatment booth, a high-temperature curing oven and a supported conveyor system; the final station sequence is selected against the hub coating system specified by the buyer.
The plant layout, fixture density and station sequence are defined during pre-sales engineering, using the 100 m × 38 m × 5.4 m hall as the baseline for this configuration. Attractivechina was founded in 2005, operates a 35,548 m² production area with 280 employees and an annual output of 60 units, and holds 79 invention patents within more than 300 patents overall. Installation, commissioning and after-sales service are included in the supply scope.
The line releases 1760 fixture trays per day at a 45-second lot cycle and 85% equipment utilization; the number of hubs per tray depends on your fixture design within the 1350 × 900 × 200 mm envelope.
Yes. The fixture set is configured for your hub range, and the tray envelope allows multi-cavity fixtures for smaller diameters.
Robotic painting is used together with autonomous mode; this combined method is the specified painting method for the line.
The chamber is held at 25±2°C and 65±10% RH, so conditions stay inside a defined window during the 22-hour operating day.
Electricity, natural gas, steam and chilled water are the media required by this configuration.
The paint booth and piping are stainless steel and the frame is carbon steel, which simplifies routine cleaning and inspection.
Yes. Pre-sales design, production, installation, commissioning and after-sales service are part of the company scope.
Attractivechina — Guangdong Chuangzhi Intelligent Equipment Co., Ltd., Zhaoqing, Guangdong, China.
Email: attractivechina@gmail.com
Phone / WhatsApp: +86 135-8061-6025
Address: Yingbin Avenue 2, High-tech Zone, Zhaoqing, Guangdong, China.
Share your hub dimensions, fixture concept and target daily output to receive a line proposal.