O menu

Fuel Tank Coating Line with Full Pretreatment and Curing

Inventário:
SKU: 3055705297
Modelo: Линия покраски автозапчастей

{{ variable.name }}

{{ value.name }}

Fuel Tank Coating Line

Automated coating line engineered for fuel tanks. Comprehensive system integrates pretreatment, painting, and curing stages. Handles large parts with rack size up to 1350x900x200mm. Continuous operation at 22h/day, 336 days/year.

  • Integrated pretreatment and curing processes for superior coating adhesion and durability.
  • Robotic painting ensures even coverage on complex tank shapes.
  • 45-second production cycle yields 1,760 racks per day, ideal for high demand.
  • Stainless steel spray booth and piping resist corrosion from chemicals.
  • Environmental compliance with VOC treatment systems available.
ItemSpecification
Part TypeFuel tanks
MaterialTypically metal (carbon steel or aluminum)
Working Days336 days/year
Daily Hours22 hours/day
Spray Booth Conditions25±2°C, 65±10% RH
Painting MethodRobotic + autonomous
Production Cycle45 s/rack (1,760 racks/day)
Max Rack SizeD1350×W900×H200 mm
Equipment Utilization85%
Energy SourcesElectricity, natural gas, steam

Can be adapted for other large automotive components. Options include flame treatment booth, automatic sandblasting, and various pretreatment stages.

Carbon steel frame for strength; stainless steel for spray booth and wet areas to resist corrosion.

Designed for fuel tank manufacturers requiring high-quality, consistent coating.

Our company has installed 20 complete lines for automotive parts, including fuel tanks. Clients report 98% first-pass yield and 20% energy savings.

Can this line handle different fuel tank sizes?

Yes, rack size permits parts up to 1350mm long, 900mm wide, 200mm high.

What is the daily production capacity?

Approximately 1,760 racks per day based on a 45-second cycle.

Does the line include pretreatment?

Yes, we can include gantry-type pretreatment systems, as shown in our images.

What curing method is used?

High-temperature curing ovens are integrated, capable of up to 200°C.

What is the MOQ?

MOQ is 2 units.

What payment terms?

50% T/T after contract, 40% before shipment, 10% after installation.

Is on-site training provided?

Yes, we provide pre-export testing and on-site guidance.

For a quote, contact: attractivechina@gmail.com | Tel/WhatsApp: +86 135-8061-6025

Fuel tank coating line
fuel tank coating line.jpg - 2205x1654

Pretreatment equipment for fuel tank line
Pretreatment equipment (1).jpg - 1006x671