Hydraulic Auto Climbing Formwork Diagonal Brace FWK-ACB 120 for Efficient High-Rise Construction Explore the FWK-ACB 120 diagonal brace hydraulic auto climbing formwork by Yancheng Lianggong. Features 100KN/120KN rated thrust, synchronized climbing, and steel construction. Ideal for high-rise core walls. ISO 9001 certified. hydraulic auto climbing formwork, diagonal brace, FWK-ACB 120, self-climbing formwork, high-rise construction /hydraulic-auto-climbing-formwork-fwk-acb-120-diagonal-brace

The FWK-ACB 120 diagonal brace hydraulic auto climbing formwork is engineered for high-rise building core walls and shear walls. This system uses an electronically controlled hydraulic lifting mechanism with a cylinder stroke of 300mm and a rate thrust of 100KN or 120KN, enabling smooth, crane-free vertical climbing. The diagonal brace structure supports top platform loads up to 0.75KN/m² and other platforms up to 1KN/m². Manufactured from robust steel and certified to ISO 9001, this system enhances construction safety and efficiency on demanding projects.

Key Selling Points

  • High Thrust Capacity: Rated thrust of 100KN and 120KN provides powerful lifting capability, suitable for heavy formwork loads.
  • Precise Synchronization: Double cylinder synchronization error ≤20mm ensures even lifting and structural alignment.
  • Crane-Free Operation: The system climbs autonomously via hydraulic cylinders, reducing tower crane dependency and freeing crane time for other tasks.
  • Robust Construction: Steel material offers durability and long service life, even in harsh site conditions.
  • Multi-Platform Support: Top platform load capacity of 0.75KN/m² and other platforms up to 1KN/m² accommodate workers and materials safely.
  • Quality Assured: Manufactured under ISO 9001:2015 quality management system, ensuring consistent product reliability.

Technical Specifications

ModelFWK-ACB 120
Structure TypeDiagonal Brace
Construction Load (Top Platform)≤0.75KN/m²
Construction Load (Other Platforms)≤1KN/m²
Lifting SystemElectronically controlled hydraulic
Cylinder Stroke300mm
Hydraulic Pump Station Flown x 2L/min (n = number of seats)
Stretching Speed300mm/min
Rated Thrust100KN & 120KN
Double Cylinder Synchronization Error≤20mm
MaterialSteel

Models and Options

The FWK-ACB 120 is available in two thrust configurations: 100KN and 120KN. Hydraulic pump station flow can be customized based on the number of seats (n). The system can be configured with various platform layouts to meet specific project requirements.

Materials and Structure

The formwork system is primarily constructed from high-strength steel, ensuring structural integrity and resistance to deformation under heavy loads. The diagonal brace design provides additional stability, making it suitable for high-rise applications where wind loads are a concern.

Applications

This system is ideal for constructing reinforced concrete core walls, shear walls, and other vertical structures in high-rise buildings, bridges, and industrial facilities. It is particularly beneficial in projects with limited crane availability or where floor heights are consistent.

Customization

Yancheng Lianggong offers customization of the diagonal brace hydraulic auto climbing formwork to suit specific project dimensions, load requirements, and site conditions. Our technical team works closely with clients to provide tailored solutions, including adjustments to platform configurations, lift speeds, and safety features.

Case Study

In a major healthcare infrastructure project in Trinidad and Tobago, LIANGGONG Hydraulic Auto-Climbing Formwork System (ACS) was successfully applied to the construction of the hospital's reinforced concrete core structures and vertical shear walls. The system enabled continuous climbing without tower crane reliance, reduced site space usage, and improved safety. The project team completed each structural level within a shortened cycle time, accelerating the overall schedule.

FAQ

What is the minimum order quantity?

The MOQ for the FWK-ACB 120 is 2 units.

What are the payment terms?

Payment terms are 50% deposit and 50% before shipment.

How is the formwork system delivered?

We offer FOB and CIF delivery methods. Please contact us for specific shipping arrangements.

Does the system require specialized maintenance?

Regular inspection and maintenance of hydraulic components are recommended. Our after-sales team provides guidance for proper upkeep.

Can the system be customized for unique project requirements?

Yes, we offer custom design and manufacturing services to meet specific project needs, including platform dimensions and load capacities.

What certifications does the product hold?

The product is manufactured under ISO 9001:2015, and our welding processes are certified to EN ISO 3834-2:2021. The factory also holds EN 1090-1 and EN 1090-2 certifications for structural steel components.

Is pre-shipment testing available?

Yes, we offer pre-shipment testing as part of our quality assurance process.

What is the typical production cycle?

Please contact our sales team for detailed lead times based on your order quantity and specifications.

Inquiry Information

For pricing, technical details, or customization inquiries, please contact:

  • Name: David Liu
  • Email: sales01@lianggongform.com
  • Tel: +86 18201051212
  • WhatsApp: +8618201051212
  • Address: No. 8, Shanghai Road, Economic Development Zone, Jianhu County, Yancheng City, Jiangsu Province, China

Images