🌍 SULONG Desde 2007 ⭐ 19+ Ano Experiência na indústria ✓ Fornecedor Elite Verificado
✓ Fornecedor Elite Verificado
O menu
Verified Project Evidence

Project Cases

Explore our proven project cases across railway, metro, undersea tunnel and mining applications, demonstrating reliable ventilation solutions and on-time delivery.

5+Casos verificados
4Países e regiões
4Setores de aplicação
100%Entrega no prazo

Histórias de sucesso de clientes

Filtre por indústria, mercado ou tipo de produto para encontrar uma implementação comparável.

5 casos exibidos
AU
Underground Tunnel VentilationProduto

Melbourne Metro Rail Project

The Melbourne Metro Rail Project involves the construction of a 9km-long tunnel within Melbourne, Australia, connecting the Sunbury and Dandenong railway route. Construction is scheduled to begin in late-2018 and operations are expected to start in 2025. We have have supplied the vent ducts of 1500mm diameter since 2019.

9 kmQuantity
3 yearsDuration
HK
Undersea road tunnel construction temporary ventilationProduto

Trunk Road T2 Tunnel

The Trunk Road T2 Tunnel is an important component of Hong Kong Route 6 and a key undersea tunnel project connecting Kowloon and Tseung Kwan O. Constructed using tunnel boring machines (TBM), it avoided large-scale land reclamation, minimizing its impact on the marine environment. It is approximately 3.4 kilometers long, including about 2.1 kilometers of undersea tunnel.

5 kmQuantity
2 yearsDuration
CN
Underground tunnel construction temporary ventilationProduto

Guangxi Beibu Gulf Project

The project undertaken by China Water Resources and Hydropower 14th Engineering Co., Ltd. in the Beibu Gulf region of Guangxi is a major national water conservancy project with a total length of 30 kilometers. The project uses domestically advanced slurry balance shield tunneling machines (about 4 meters in diameter) to specifically address the challenges of the Beibu Gulf region's abundant water and complex geology.

30 kmQuantity
3 yearsDuration
GLOBAL
Primary Forced Ventilation and Hazardous Gas Dilution for Buritică Gold MineProduto

Global Tier-1 Mining Conglomerate and EPC Contractor

100% stable, continuous operation with a zero defect and rejection rate, ensuring the supply of fresh underground air and compliance with safety standards for multinational mine audits.

20km per yearQuantity
3 yearsDuration
Nenhum caso correspondente. Tente alterar os filtros.

Tem um projeto similar?

Compartilhe as condições do seu local, dimensões necessárias e aplicação. Nossa equipe de engenharia recomendará uma solução comparável.

Caso de projeto